Omnetech

Overview · IT infrastructure guide

What to check when choosing IT infrastructure and cloud solutions

At Omnetech, we guide growing companies through enterprise IT infrastructure decisions, from compute and storage to network and management layers. This guide shares our practical checks, evaluation weeks and cost traps so you can choose cloud, managed or on-premises with confidence.

Four layersDecision matrixVendor checks30-day plan
ILLUSTRATIVE STACK YOU BUY Management: monitoring, patching, paging Network: bandwidth, latency budget, egress Storage: IOPS, durability Compute: cores, vCPU Each layer fails on its own; ask about each separately

Four weeks from inventory to decision.

1. The four layers you actually buy: compute, storage, network, management

When you buy infrastructure, you are buying four distinct layers. We break them down so you can specify each one clearly.

  • Compute: virtual CPUs (vCPU) and memory (GiB). Ask for sustained performance, not burst credits. For a growing business, we suggest starting with 4 to 8 vCPUs and 16 to 32 GiB RAM per production node.
  • Storage: block, file or object. Check IOPS (input/output operations per second) and throughput. A typical database might need 3,000 IOPS and 100 MB/s; object storage for backups can be slower but cheaper.
  • Network: bandwidth (Gbps), latency (ms) and private connectivity. Internal service calls should stay under 1 ms; cross-region replication may tolerate 50 ms.
  • Management: APIs, monitoring, patching and identity. Without this layer, you cannot automate or audit. Look for role-based access control (RBAC) and audit logs.

We map each layer to a service level agreement (SLA). For example, compute SLAs often promise 99.9% availability, which allows about 43 minutes of downtime per month. Storage durability might be 99.999999999% (eleven nines) for object stores. Network SLAs vary; check latency and packet loss guarantees. The management layer rarely has an SLA, but it determines how fast you recover. We recommend writing your own internal SLA for management tasks: patch within 7 days, respond to alerts within 15 minutes. This four-layer view prevents you from overpaying for one layer while underpowering another. It also gives you a common language with vendors. When a provider says "cloud," ask which layers they manage and which you still own. That question alone saves months of confusion.

2. Build, managed service or cloud: a decision matrix with real trade-offs

We compare three models: build on-premises, managed hosting and public cloud. The table below summarises the trade-offs. Numbers are illustrative.

Illustrative comparison of infrastructure models (numbers are illustrative)
ModelControlUpfront costExit effortTypical failure mode
Build on-premisesFullHigh (e.g. £50,000 for servers and network)High (physical decommissioning, data wipe)Capacity exhaustion or hardware failure
Managed hostingSharedMedium (e.g. £5,000 setup)Medium (data export, contract notice)Provider lock-in or slow support
Public cloudLimitedLow (pay-as-you-go)Low to medium (API-based export)Runaway costs or region outage

We use this matrix in workshops. Control matters for regulated data; upfront cost matters for cash flow; exit effort matters for flexibility; failure mode matters for risk. For a growing business, we often recommend a hybrid: keep sensitive databases on-premises or in managed hosting, and use public cloud for bursty web workloads. That balances control with elasticity. But hybrid adds complexity: you need consistent identity and network routing. We check that your team can manage two environments without doubling headcount. If not, choose one model and commit. The worst outcome is a half-migrated estate where neither side is optimised. We also look at the cloud shared responsibility model. The provider secures the cloud; you secure what you put in it. That split is defined in NIST SP 800-145, which we reference when explaining service models (IaaS, PaaS, SaaS). For architecture patterns, we follow the Google Cloud Architecture Framework. These public references help us align your team and your vendor on the same vocabulary.

3. The checks that catch expensive surprises before the contract

Before you sign, run these checks. We do them in order and document each result.

  1. Benchmark real workload: deploy a representative test (e.g. 1,000 concurrent users) and measure response time. Target under 200 ms for web pages.
  2. Verify SLA credits: ask what percentage of monthly fee you receive if availability drops below 99.9%. Many providers offer 10% credit, which may not cover your loss.
  3. Test support responsiveness: open a non-critical ticket and time the first response. Aim for under 30 minutes for production issues.
  4. Check data portability: export a sample dataset (e.g. 100 GB) and measure time and cost. If it takes more than 24 hours or costs more than £100, flag it.
  5. Review security certifications: look for ISO 27001 or SOC 2. Absence is not fatal, but you must compensate with your own controls.
  6. Model three-year total cost: include compute, storage, network, support and expected growth. Compare against your budget with a 20% contingency.

We also check the provider's status page history. Frequent incidents in your region are a warning. For cloud, review the NIST cloud computing reference architecture to understand roles and responsibilities. These checks take about two weeks but prevent surprises like egress fees or incompatible APIs. We insist on a written exit plan before signing. That plan names the data format, the export method and the maximum notice period. Without it, you are not buying infrastructure; you are renting a trap.

4. A thirty-day evaluation plan for a growing business

We run a four-week evaluation. Each week has a clear artefact.

  • Week 1: Requirements and baseline. List your top five workloads. For each, record current CPU, memory, storage and network usage. Artefact: a one-page baseline table.
  • Week 2: Shortlist and paper test. Score three providers against your baseline. Use criteria: performance, cost, support, compliance. Artefact: a weighted scorecard.
  • Week 3: Hands-on pilot. Deploy a non-critical workload (e.g. a staging web server) on each shortlisted platform. Measure deployment time, latency and cost for 7 days. Artefact: a pilot report with numbers.
  • Week 4: Negotiation and exit plan. Ask for contract changes based on pilot findings. Draft an exit plan with data formats and timelines. Artefact: a signed contract or a decision to stay.

We keep the pilot small: 2 vCPUs, 8 GiB RAM, 100 GB storage. That costs roughly £50 to £150 for the week, depending on provider. During the pilot, we test failure: reboot a node, detach a disk, and observe recovery. We also measure support response by opening a ticket. By the end of week 4, you have evidence, not opinions. This plan fits a growing business because it does not require a large team. One engineer can run it part-time. We recommend repeating the evaluation every 18 months, because prices and services change. The goal is not to find the perfect provider but to avoid a costly mismatch. Our thirty-day plan gives you that confidence.

5. Costs that hide: egress, support tiers and exit fees

We see three hidden costs most often. First, egress: data leaving the provider. Prices vary; illustrative rates are £0.07 per GB for the first 10 TB, then £0.05 per GB. If you serve 50 TB per month, that is £3,500. Second, support tiers: basic support may be free but slow; business support can add 10% to 20% of your compute bill. For a £10,000 monthly bill, that is £1,000 to £2,000. Third, exit fees: some contracts charge for early termination or data extraction. We have seen fees of £5,000 or more. To avoid these, we model three years of costs with growth. We also ask for a cap on egress or a private interconnect. For support, we negotiate a response time SLA, not just a tier name. For exit, we insist on a clause that allows data export at cost. We also check API rate limits, which can slow migration. These costs do not appear in headline prices, but they decide whether your infrastructure is affordable at scale. We recommend a simple rule: if a cost is not in the contract, assume it is yours. That mindset keeps growing businesses out of budget trouble.

Next, we suggest you pick one workload and run our thirty-day evaluation plan. Start with Week 1 baseline, then contact Omnetech for a shortlist review. That single step turns infrastructure from a guess into a measured decision.

Sources

The substance of this page rests on the published material linked below. It is independent of this site and was read before writing.