30-day plan · IT infrastructure guide

A thirty-day evaluation plan for a growing business

Omnetech guides growing companies through a thirty-day evaluation of IT infrastructure and cloud options, so decisions about servers, storage, egress, SLA and workload placement rest on measured evidence rather than assumption. This plan keeps every week focused on infrastructure and cloud trade-offs.

Four layersDecision matrixVendor checks30-day plan

Four weeks from inventory to decision.

Week 1: inventory what you run and who depends on it

We start by building the inventory sheet. This is the single source of truth for every server, virtual machine, container host, database, storage volume and network path in scope. For each item we record cores, memory, storage in TB, average and peak CPU, monthly egress in GB, and the business owner. We also note the current SLA for each workload, the recovery point objective in RPO hours, and whether the workload is latency sensitive. The inventory sheet turns vague concerns about on-premises capacity into numbers we can compare with cloud options later.

We then map dependencies. A workload that looks small may feed a reporting database, an identity service or a partner API. We trace those links so that any future migration does not break a hidden consumer. For each dependency we record the protocol, the direction of traffic, and the monthly data volume. This dependency map also reveals where egress charges would appear if we moved a workload to a public cloud, because every cross boundary call becomes a billable event.

By the end of week one we have a complete inventory sheet and a dependency map. We also flag any server that is past end of support, any storage volume above 80 percent used, and any workload with an RPO of four hours or less. Those flags become the first candidates for the shortlist in week two.

Week 2: shortlist two options and load-test the risky assumption

We take the inventory sheet and reduce it to two credible options. One is usually a refined on-premises or colocation design, and the other is a cloud architecture. We describe each option in terms of cores, memory, storage in TB, expected monthly egress in GB, and the SLA we would need. We do not compare marketing claims. We compare the numbers from week one against the published limits of each option.

The risky assumption is the one that would break the business case if it were wrong. Common examples are a latency sensitive workload that cannot tolerate a cross region call, a database that needs more IOPS than the cloud tier provides, or an egress pattern that would cost more than the compute saved. We design a load test for that single assumption and run it for at least three days. The load test report records throughput, error rate, p95 latency, and the observed egress in GB per day. We also record the cost of the test itself so that it appears in the week four total cost sheet.

We use the Google Cloud Architecture Framework to structure the non functional review of the cloud option, covering reliability, security, cost and operational excellence. That framework helps us ask whether the proposed design meets the SLA we wrote down, rather than assuming it does. The load test report either confirms the assumption or forces us to revise the shortlist before we spend more time on either option.

Week 3: security review, residency check and exit rehearsal

Security review starts with the inventory sheet again. We list every workload that handles personal data, payment data or regulated records, and we record the data residency requirement for each. For a cloud option we check where the data would be stored, where it would be processed, and where backups would reside. For an on-premises option we check physical access, network segmentation and backup isolation. We use the NIST cloud computing reference architecture to keep our definitions consistent when we compare provider models, because unclear terms lead to unclear risk.

The residency check is not a legal opinion. It is an infrastructure check. We confirm that the proposed region or data centre can meet the residency requirement, that replication does not cross a forbidden boundary, and that support access does not create an unintended path to the data. We record the result in the exit rehearsal log alongside the next test.

The exit rehearsal is the most useful hour of the week. We take one non critical workload and rehearse leaving the current platform. We export its data, rebuild it in the target environment, and measure the time to restore service. The exit rehearsal log records the export size in TB, the egress in GB, the restore time in hours, and the RPO achieved in hours. If the rehearsal fails, we know the migration risk before we commit, not after. If it succeeds, we have evidence that the exit path is real.

Week 4: total cost sheet and the decision meeting

We build the total cost sheet from the artefacts of the first three weeks. It includes compute, storage, network, egress, backup, licensing, support, and the staff hours needed to run each option. We separate one off migration costs from recurring monthly costs, and we show a three year view. Every number traces back to the inventory sheet, the load test report or the exit rehearsal log. We do not use list prices without a source, and we do not invent discounts.

The total cost sheet also shows the cost of doing nothing. If the on-premises estate needs a refresh in eighteen months, that refresh belongs in the comparison. If the cloud option needs a commitment to reach a lower rate, we show the break even point in months. We also show the egress sensitivity: how much monthly egress in GB would make the cloud option more expensive than the on-premises option.

Illustrative four week evaluation plan. Hours and artefacts are illustrative only.
WeekActivityHours per weekArtefact produced
1Inventory servers, storage, dependencies and SLA10Inventory sheet
2Shortlist two options and load test the risky assumption12Load test report
3Security review, residency check and exit rehearsal10Exit rehearsal log
4Total cost sheet and decision meeting8Total cost sheet

The decision meeting uses the total cost sheet as the only financial input. We review the SLA for each workload, the RPO hours, the egress exposure and the migration risk from the exit rehearsal log. We then choose one of three outcomes: proceed with the cloud option, proceed with the on-premises option, or stay put and fix specific weaknesses. The meeting ends with a named owner and a date for the next infrastructure review.

What to do when the evaluation says stay put

Staying put is a valid result. If the total cost sheet shows that a migration would increase monthly cost without improving the SLA, or if the exit rehearsal log shows an unacceptable restore time, we keep the workload where it is. We then use the inventory sheet to target the weakest points. That might mean replacing a storage volume that is above 80 percent used, adding a second network path, or improving the backup RPO from twenty four hours to four hours.

We also set a trigger for the next evaluation. A trigger can be a storage threshold in TB, a monthly egress figure in GB, a support renewal date, or a change in the SLA requirement. When the trigger is reached, we rerun the relevant week rather than the whole thirty days. This keeps the infrastructure decision current without repeating work that is still valid.

If the evaluation says stay put, we still produce a short migration note. It records what we tested, what we measured, and why we deferred the move. That note saves time when the question returns, because the next team can start from evidence instead of starting from zero.

Our next step is to schedule the inventory workshop and agree the SLA and RPO targets for each workload, so the thirty day evaluation begins with shared numbers and ends with a defensible infrastructure decision.