1. Compute: cores, vCPUs and when oversubscription hurts
Compute is the layer that runs your code. Whether you choose cloud instances, a managed private cloud or on premises servers, the unit you compare is the virtual CPU (vCPU) and its underlying physical core. Vendors often oversubscribe physical cores to vCPUs. A 1:1 ratio means no oversubscription; a 4:1 ratio means four vCPUs share one core. For steady workloads such as databases or real time APIs, oversubscription above 2:1 adds latency. We have seen p95 response times rise from 45 ms to 180 ms when a host was oversubscribed 6:1, and that was during a normal Tuesday, not a peak.
Ask the vendor for their oversubscription ratio and whether it is guaranteed or best effort. A red flag is an answer like "it depends on the workload" without a number. For a starting budget share, we suggest 40 percent of your monthly infrastructure spend on compute. During evaluation week, run a CPU stress test for 30 minutes and measure steal time. If steal time exceeds 5 percent, the host is too busy. For cloud, check the Google Cloud Architecture Framework for guidance on right sizing. For a vendor neutral definition of service models, see the NIST cloud computing reference architecture.
2. Storage: IOPS, durability classes and backup you can restore
Storage is the layer that keeps your data. The three numbers that matter are capacity in TB, throughput in MB/s and IOPS (input/output operations per second). A standard SSD might deliver 3,000 IOPS at 4 KB block size, while a high performance tier can reach 20,000 IOPS. Durability is expressed as nines: 99.9 percent (three nines) means about 8.8 hours of downtime per year; 99.99 percent (four nines) means 52 minutes. Do not confuse durability with backup. We ask vendors to show a restore of a 1 TB volume from backup to a running instance. If they cannot do it in under 4 hours, that is a red flag.
For backup, we recommend the 3-2-1 rule: three copies, two different media, one off site. Test a restore during evaluation week. A reasonable starting budget share for storage and backup is 25 percent. If your vendor charges for egress when you restore from their backup, that is a hidden cost. Ask for the price per GB of restore egress. Illustrative example: restoring 2 TB at 0.01 per GB would cost 20, but some vendors charge 0.12 per GB, which is 240. That difference matters.
3. Network: bandwidth, latency budgets and the egress trap
Network is the layer that moves data between your users, your compute and the internet. Bandwidth is measured in Mbps or Gbps; latency in milliseconds (ms). For interactive web applications, we target under 100 ms round trip from user to server. For database replication between regions, we target under 20 ms. The egress trap is the cost of data leaving a cloud provider. Ingress is often free, but egress can be 0.08 to 0.12 per GB. If you move 10 TB per month out, that is 800 to 1,200. Ask the vendor for their egress price per GB and whether it is tiered. A red flag is "we do not charge for egress" without a written commitment.
During evaluation week, run a 24 hour network test: measure throughput and latency every 5 minutes. If latency spikes above 150 ms more than 1 percent of the time, the network is not ready. For a starting budget share, allocate 20 percent to network, including egress. We always ask the egress question first because it is the most common surprise on the bill.
4. Management: monitoring, patching and who gets paged at night
Management is the layer that keeps the other three running. It includes monitoring, patching, incident response and who gets paged at 2 AM. A managed service means the vendor handles patching and monitoring; you handle application level alerts. A cloud service means you handle both, unless you buy a managed add on. Ask the vendor: what is your mean time to detect (MTTD) and mean time to resolve (MTTR)? For a managed service, we expect MTTD under 5 minutes and MTTR under 4 hours for critical incidents. A red flag is an answer like "we monitor everything" without a number.
During evaluation week, request a sample incident report and a patching schedule. If patching happens without a maintenance window, that is a red flag. A reasonable starting budget share for management is 15 percent. This includes the cost of a monitoring tool, a ticketing system and on call staff. If you are comparing cloud versus managed versus on premises, the management layer is where the hidden labour cost lives. On premises often looks cheaper on compute and storage but adds 20 to 30 percent in management overhead.
5. How the four layers fail independently
Each layer can fail without the others. Compute can fail due to a noisy neighbour or a host crash. Storage can fail due to IOPS throttling or a corrupted backup. Network can fail due to a misconfigured route or an egress cap. Management can fail due to an unpatched vulnerability or an alert that nobody saw. We test each layer separately during evaluation week. For compute, we run a CPU stress test. For storage, we restore a 1 TB volume. For network, we run a 24 hour latency test. For management, we simulate a 2 AM page and measure response time.
If one layer fails, the others may still work, but your service may be down. For example, a network egress cap can stop data replication even if compute and storage are healthy. A management failure can leave a patched vulnerability open for weeks. We recommend a layered budget: 40 percent compute, 25 percent storage, 20 percent network, 15 percent management. These are illustrative starting points, not fixed rules. Adjust based on your workload. A database heavy application might shift 10 percent from compute to storage.
| Layer | What to ask a vendor | Red flag answer | Reasonable starting budget share (Illustrative) |
|---|---|---|---|
| Compute | What is your vCPU to physical core oversubscription ratio? | "It depends" without a number | 40 percent |
| Storage | Can you restore a 1 TB volume in under 4 hours? | No documented restore test | 25 percent |
| Network | What is your egress price per GB and is it tiered? | "We do not charge for egress" without a written commitment | 20 percent |
| Management | What is your MTTD and MTTR for critical incidents? | "We monitor everything" without a number | 15 percent |
Your next infrastructure step today is to write down one question for each layer and send it to your current or prospective vendor. For compute, ask the oversubscription ratio. For storage, ask for a restore time. For network, ask for the egress price per GB. For management, ask for MTTD and MTTR. Then schedule a 30 minute call to review the answers. If any answer is vague, that is your first risk. We at Omnetech use this exact checklist before every evaluation week. Start with the egress question first, because it is the one that most often turns a fixed budget into a variable one.
Sources
The substance of this page rests on the published material linked below. It is independent of this site and was read before writing.